High voltage switch cabinet operating stop sending key poin

Date:2017/2/7 16:30:12      Viewed:

1, in the work of all and part of the charged plate, maintenance equipment and operation should be separated with clear sign, this and the operation of the meter box is very close.
2, a secondary winding of current transformer and voltage transformer should be permanent and reliable grounding protection.
3, working in the operation of current transformer secondary circuit, the current loop are forbidden to disconnect
4, voltage transformer secondary circuit in operation work strictly prevent short circuit or check the power-off protection and secondary loop staff, without the permission of the personnel on duty are not allowed to make any brake operation.
> > > > operation in high voltage switch cabinet in sending procedures should pay attention to the following nine o 'clock
Try 1, wear protective equipment, using high pressure electric appliance city high voltage is normal.
2, open the earthing knife lock.Remove the ban closing them.
3, counterclockwise, opening grounding knife.
4, check the grounding instructions in the off position.
5, lock the grounding knife lock.
6, open the switch lock.
7, counterclockwise operation will switch is closed, then reverse clockwise energy storage operation.
8, check the status of three indicator in on.
9, lock the switch lock.
> > > > high voltage switch cabinet power operation should pay attention to the following at seven o 'clock
1, disconnect the low-voltage distribution cabinet into the line of cabinet total load switch.
2, check the status of three indicator in on.
3, press the power switch with the hand, hear switch action so far.
4, with the high voltage electric equipment respectively to the L1, L2, L3, indicator light should be with a white flicker-free.
5, unlock grounding knife.
6, clockwise operation, close the grounding knife.
7, check grounding instructions in ground state.Hang up the ban on closing them.

Prev:Protection circuit continuity design requirements
Next:Introduction to the operation and maintenance in high-voltage switchgear
Add:No. 310 Wei 17th Road, Yueqing Economic Development Zone, Yueqing City, Wenzhou City, Zhejiang Province, China hotline: 0086-577-61673333  
? Zhejiang COTTOH Electric Co.,Ltd. All rights reserved.
主站蜘蛛池模板: 二连浩特市| 宣汉县| 沁水县| 大同市| 阜新| 改则县| 涡阳县| 兴隆县| 红安县| 宝鸡市| 十堰市| 浪卡子县| 丰镇市| 乐平市| 星子县| 农安县| 电白县| 郎溪县| 宁城县| 东丽区| 甘洛县| 兰州市| 淅川县| 磴口县| 新丰县| 临城县| 綦江县| 临澧县| 湾仔区| 石林| 固安县| 荣成市| 万源市| 楚雄市| 赤峰市| 密山市| 孟连| 咸阳市| 连云港市| 繁昌县| 长治市|